Skip to main content

SELECTED WORK / THE KIRCHOFF GROUP

Twentynine Palms Structural Repair

Engineer-coordinated repair-in-place of 12 roof-truss assemblies at an occupied Twentynine Palms home.

← All Projects
Finished reinforced attic framing in Twentynine Palms, showing engineer-designed truss assemblies sistered beside the existing roof trusses.

BEHIND THE BUILD

Project story

In March and April 2025, TKG led a structural repair to the rear roof of an occupied home in Twentynine Palms, California. Twelve failing truss assemblies required a repair-in-place strategy that would avoid much broader roof and interior demolition. Working with its structural engineer, TKG custom designed a stronger truss assembly to sit immediately beside each cracked existing truss. The team selectively opened the upper rear roof to reach the affected framing, then built and sistered 12 new assemblies to the failing originals using engineer-directed lumber and connection details. Field conditions were coordinated as the structure was opened. After the structural work, displaced electrical and HVAC services were restored, new blown-in insulation was installed and removed sheathing was replaced. A roofing subcontractor reassembled the tile roof. The sequence allowed the clients to remain in their home during construction rather than move out as the insurance adjuster had expected. The photo sequence documents temporary site access, selective roof opening, the sistered truss assemblies and connection details, insulation work and tile reinstallation.

The gallery includes completed work and, where documented, construction-stage views that reveal the structure and craft behind it.

Rear view of the Twentynine Palms home during truss repair, with temporary stair access, lifting equipment and roof tiles staged for reinstallation.
The opened rear roof reveals the existing truss assemblies and mechanical ductwork before the repair was enclosed.
Elevated view through the opened roof framing at the Twentynine Palms truss repair.
Inside the opened attic, new framing and existing mechanical ductwork during the engineered truss repair.
A row of reinforced roof-truss assemblies with new sistered members and plywood connection plates inside the attic.
Close-up of plywood gusset plates and fastener pattern at a reinforced roof-truss joint.
A worker installing blown-in insulation as the opened roof was being enclosed with new sheathing.
Concrete roof tiles being reinstalled over the reinforced truss area in Twentynine Palms.

YOUR PROJECT

Have a space in mind?

Tell us what you are thinking about. Plans are not required.

Start Your Project
Start Your Project