Joshua Tree A-Frame

An approximately 850-square-foot A-frame under construction in Joshua Tree, California. Full project details and finished photography will follow completion.

← All Projects
Joshua Tree A-frame exterior construction in March 2026, with exposed sheathing, weather barrier, installed windows and temporary landing.

BEHIND THE BUILD

Project story

In progress in Joshua Tree, California, this 850-square-foot A-frame is one of TKG’s current small-footprint builds. We are reserving this case study for verified project details, the final outcome and finished photography after construction wraps up.

The gallery includes completed work and, where documented, construction-stage views that reveal the structure and craft behind it.

Joshua Tree A-frame site excavation and compact excavator on the graded desert pad, April 2025.
Joshua Tree A-frame footing excavation, reinforcing steel and layout lines before concrete, April 2025.
Joshua Tree A-frame foundation formwork and bracing under construction, May 2025.
Joshua Tree A-frame first sloped roof frames and floor platform during assembly, June 2025.
Joshua Tree A-frame roof framing being raised with a telehandler on site, June 2025.
Joshua Tree A-frame roof sheathing and skylights with the front framing still open, June 2025.
Joshua Tree A-frame exterior in bare sheathing with open front windows and entry, August 2025.